Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Engineering

Import and Update Modified Data from AVEVA Process Simulation in AVEVA Engineering Manually

Import and Update Modified Data from AVEVA Process Simulation in AVEVA Engineering Manually

  • Last UpdatedDec 02, 2024
  • 1 minute read

Import and Update Modified Data from AVEVA Process Simulation in AVEVA Engineering Manually

To Import and update modified data from Process Simulation in AVEVA Engineering manually

  1. Import Notification From AVEVA PRO/II Simulation.

  2. Open Functional Item Grid.

  3. Select all functional items.

  4. On the Simulation tab in the Functional Items area, click Update PFD to display the Compare and update window.

  5. In the Tags panel, select the checkbox in the title bar to enable all check boxes in the panel.

  6. Select the check box of the Show Attributes for selected Unit Operations option.

  7. In the Attributes panel, select the checkbox in the title bar to enable all check boxes in the panel.

  8. Click Update.

    The database is updated.

TitleResults for “How to create a CRG?”Also Available in