Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Engineering

HVAC Element (HVAC)

  • Last UpdatedOct 24, 2024
  • 1 minute read

Piping Major Items Element

Primary Element

Attributes

Name

Name of the element

Description

Description of the element

Function

Function

Stdcode

Standard code

Purpose

Description code word

Built

Built/Unbuilt flag

Shop

Shop/Site flag

Bore

Bore

Temperature

Temperature

Pressure

Pressure

TPressure

TestPressure

Pspec

Pipe specification

Ispec

Insulation spec reference

Tspec

Tracing spec reference

Matref

Material reference

Fluref

Fluid reference

Casref

Case reference

Ccentre

Cost center

Cclass

Cost class

Linetype

Line type

Erection

Erection class

Rev

Pipe Revision number

Safclass

Safety class

Duty

Duty

Dscode

Design code

Ptspec

Paint specification

Inschedule

Inspection schedule

Skey

Symbol key

Lissue

True if drawing has been issued

Wmaximum

Maximum weld number in current spool drawing

Pmaximum

Maximum part number in current spool drawing

Smaximum

Maximum spool number in current spool drawing

Jmaximum

Maximum joint number in current spool drawing

Drrf

Old spooler drawing reference

Cdrg

Isodraft Compipe: Drawing number

Cnumber

Isodraft Compipe: Line number

Carea

Isodraft Compipe: Area

Splprefix

Spool number prefix

Orrf

Origin reference (for templates)

Uuidia

Universally unique identifier

Deldsg

Delivery Designation flag

Mdsysf

Reference Array of Model and Design Elements

Inprtref

Inside paint reference

Ouprtref

Outside paint reference

Conveyor Element (CONVEYOR)

Zone Element (ZONE)

Branch Element (BRANCH)

HVAC Spool List Element (HSLIST)

Restraint Element (RESTRAINT)

Text Element (TEXT)

In This Topic
TitleResults for “How to create a CRG?”Also Available in