Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Engineering

Send Updated Data from AVEVA Process Simulation to AVEVA Engineering and Update Manually

Send Updated Data from AVEVA Process Simulation to AVEVA Engineering and Update Manually

  • Last UpdatedDec 02, 2024
  • 1 minute read

Send Updated Data from AVEVA Process Simulation to AVEVA Engineering and Update Manually

Instead of:

You can can quickly import the notification and manually propagate the grids with the updated data.

Prerequisite

To send the updated data from AVEVA Process Simulation to AVEVA Engineering and to update the Functional Items (FUNITES) manually

  1. Send Updated Data From AVEVA Process Simulation to AVEVA Engineering, for example, a Pro 2 snapshot.

  2. Import and Update Modified Data from AVEVA Process Simulation in AVEVA Engineering Manually

    The database in AVEVA Engineering is updated.

TitleResults for “How to create a CRG?”Also Available in