Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Pipeline Operations for Liquids

Configure the Product Transfer Checking Record DRA tab

Configure the Product Transfer Checking Record DRA tab

  • Last UpdatedApr 24, 2025
  • 1 minute read

DRA tab on the Product Transfer Checking (flowxfer) Row Details

To configure the DRA tab on the Product Transfer Checking (flowxfer) Row Details

  1. Check Enable to activate Automatic DRA Shutdown in the event that an undesirable product is about to be inserted into the pipeline.

  2. In the Shutdown Command field, enter the command that is to be issued when the pipeline is to be shut down. Depending on the message set that is configured, this is usually CLOSE or STOP.