Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Pipeline Operations for Liquids

Assign violation checking to the Injection Device

  • Last UpdatedApr 24, 2025
  • 1 minute read

The start and stop of the Drag Reducing Agent (DRA) injection is not handled from the Controller's DRA Control screen. Instead, the DRA Control provides navigation to the Status, Multistate, or Pump Control where the command can be issued. Command validation checking must therefore be enabled by assigning a rule to the status, multistate, or pump record using the Rule Validation Engine (RVE) utility. The rule entered to handle this validation is DRAInjectorStartVerify.

For more information, see Understand the Rules Validation Engine (RVE) rules for Drag Reducing Agent (DRA) Injector.