Launching a Meter Prove run
- Last UpdatedApr 24, 2025
- 1 minute read
To launch a Meter Prove run
-
From the Prover Control window for your desired Meter Prove record, enter the appropriate run parameters.
-
Select Prove to launch the first Prove run.
A Command Confirmation message will appear.

A prove performs checks on temperature and pressure limits in addition to ensuring that the deviation in counts is within the allowable limits.
-
A run is marked as bad if any criteria, including count deviation, is greater than the allowable limit for that meter. A bad run is not counted as part of the valid run series.
-
If all of the criteria is met, the application automatically launches the next run until the configured number of runs have been completed.
-
-
Select Yes to begin the Meter Prove.