Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Pipeline Operations for Liquids

Launching a Meter Prove run

  • Last UpdatedApr 24, 2025
  • 1 minute read

To launch a Meter Prove run

  1. From the Prover Control window for your desired Meter Prove record, enter the appropriate run parameters.

  2. Select Prove to launch the first Prove run.

    A Command Confirmation message will appear.

    Embedded Image (65% Scaling) (LIVE)

    A prove performs checks on temperature and pressure limits in addition to ensuring that the deviation in counts is within the allowable limits.

    • A run is marked as bad if any criteria, including count deviation, is greater than the allowable limit for that meter. A bad run is not counted as part of the valid run series.

    • If all of the criteria is met, the application automatically launches the next run until the configured number of runs have been completed.

  3. Select Yes to begin the Meter Prove.