Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Pipeline Operations for Liquids

Countdown

  • Last UpdatedJul 04, 2024
  • 1 minute read

Countdown is a data package that tracks progress towards a Controller-defined volume target for a rate point.

The Controller can schedule numerous targets. Scheduling involves entering the target into the record prior to a volume count being tracked against it. These targets are in either the Scheduled or Next position and are part of a queue that ranks them in order of which target will move into the Current position. The application can only track the target in the Current position.

When a Controller sets a target volume and tracking begins, the application:

  • Saves the starting volume from the meter.

  • Calculates the following countdown information:

    • Count Up โ€” The amount of product that passed through the meter.

    • Countdown โ€” The amount of product to be counted until the target volume is reached.

    • Switch Time โ€” The estimated elapsed time until the target is reached.

    • Estimated Flow Rate โ€” Determined as part of meter processing.