Define the On-Peak Times
- Last UpdatedJul 04, 2024
- 1 minute read
The purpose of the On-Peak Times on the On/Off Peak Configuration tab of the pumpstation Row Edit dialog is to assign on-peak times to the days of the week. There can be two periods for each day of the week where on-peak rates apply.
-
Each row number matches a particular day of the week (for example, day 0 is Sunday). The row numbers and corresponding days of the week are documented in the table below.
-
Each period is defined by a start time and stop time. The stop time must be greater than the start time.
-
The times for a period may be left blank. In this case, the period is ignored.
-
Times may be in the format HH:MM:SS or HH:MM.
Row Number
Day of the Week
0
Sunday
1
Monday
2
Tuesday
3
Wednesday
4
Thursday
5
Friday
6
Saturday

To define On-Peak Times
-
Enter the Start Time and Stop Time using either of the following formats:
-
HH:mm:ss
OR
-
HH:mm
-