Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Pipeline Operations for Liquids

Link an Action Sequence Set Step to a failure path

  • Last UpdatedApr 24, 2025
  • 2 minute read

To link an Action Sequence Set step to a failure path

  1. Open the Action Sequence Designer for the Action Sequence of interest. For more information on how to open the Action Sequence Designer, see Open an Action Sequence in the Action Sequence Designer.

    The Action Sequence Designer window opens.

    Action Sequence Designer window

  2. Do one of the following:

    • Insert a new Action Sequence Set Step into the Action Sequence. For more information on how to insert an Action Sequence Step into an Action Sequence, see Insert new Action Sequence Steps.

    • Identify the existing Action Sequence Set Step you wish to link.

  3. Do one of the following:

    • If a failure path has been configured, drag the mouse from the Failure port of the Action Sequence Set step to the In port of the first Action Sequence step of the failure path.

      The Action Sequence Designer displays the updated link.

      Action Sequence Designer displays the updated link

    • If a failure path has not been configured:

      1. Drag the mouse from the Failure port of the Action Sequence Set step to an empty location on the Action Sequence Designer window.

      2. Create the first step in the failure path by selecting an Action Sequence step type from the Action Sequence Step Type menu.

        Action sequence step types

      3. Configure the new Action Sequence step. For more information on how to configure Action Sequence steps, see Configure Action Sequence steps.

        Note: A failure path can include more than one Action Sequence step. Insert additional Action Sequence steps to construct the failure path. For more information, see Insert new Action Sequence Steps.

  4. Click Save to save the changes to the Action Sequence.