Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Update

  • Last UpdatedJan 23, 2023
  • 1 minute read

For drawings with minor changes, from the Existing Drawing part of the Isometric Production window, select the Update option button to display a processing window detailing the production process.

The existing annotations are analysed and reused as necessary, text and data within annotations is updated. The annotation position and style remains unchanged. All annotations not required are deleted and new annotations created.

Related Links
TitleResults for “How to create a CRG?”Also Available in