Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

PCOM circular requirements

  • Last UpdatedApr 14, 2025
  • 2 minute read

This topic describes the specification requirements for circular pipe (PCOM) components.

This component type does not exist in the AVEVA supplied Catalogue for Circular HVAC, but it can be implemented with the configuration described in this topic.

Unlike the PCOMs used for the PIPING discipline, the PCOMs for HVAC are limited to inline components that only have an arrive and leave connection. That means it is not possible to include an offline P3 connection.

Parameter description requirements

  • Parameter #1 = Width of arrive

Data set requirements

For information about data set requirements that apply for all circular components, refer to Circular component requirements.

The following requirements are in addition to the data references that are created for parameters.

KEY

Type

Description

Default ( /Expression **)

SHAP

Null

Duct shape

‘CIRC’

AARR

Distance

Width of arrive

PARA[1 ]

BARR

Distance

Height of arrive

0

ALEA

Distance

Width of leave

PARA[1 ]

BLEA

Distance

Height of leave

0

** Where the Default value is set to a parameter, the Expression value must be set to the same parameter. This is applicable for all component types.

P-point requirements

For information about P-point requirements that apply for all circular components, refer to Circular component requirements.

The following table shows the additional required P-points:

Type

Connection Type (PCON)

Bore (PBOR)

Axis Direction (PAXI)

PZ Axis (PZAXI)

Point Width (PWID)

PDShape attribute

AllAngle attribute

1

PTAX

CIRC

(RPRO AARR + RPRO BARR)

-Z

Y

(RPRO AARR + RPRO BARR)

CIRC

1

2

PTAX

CIRC

(RPRO ALEA + RPRO BLEA)

Z

Y

(RPRO ALEA + RPRO BLEA)

CIRC

1

61

PTMI

0

0

Y

unset

unset

0

unset

62

PTMI

0

0

Y

unset

unset

0

unset

63

PTMI

0

0

Y

unset

unset

0

unset

64

PTMI

0

0

Y

unset

unset

0

unset

Specification requirements

The following specification headings are required:

  • Type (TYPE)

  • Duct Shape (PSHA)

  • Duct Width (PWID)

  • Duct Height (PHEI) = 0

The Specific Type (STYP) can be used to differentiate between different PCOM types.

In This Topic
TitleResults for “How to create a CRG?”Also Available in