Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Create Spool Drawings

  • Last UpdatedFeb 14, 2025
  • 1 minute read

Before selecting pipework elements to be added to a spool drawing (SPLDRG). The spool drawing hierarchy must be created in the Fabrication database. Refer to Database Structure and Draw for further information on the hierarchy.

The selection becomes the Current Element (CE) in the Fabrication Explorer and displays as the active Spool Drawing in the text box on the SPOOL toolbar.

Related Links
TitleResults for “How to create a CRG?”Also Available in