Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Setting the Bottom-of-Pipe Position

  • Last UpdatedFeb 19, 2025
  • 1 minute read

Keywords

BOP

Description

The BOP command moves the specified pipes such that their outside diameters are resting on the rack plane in the BASE direction.

Examples

BOP /ZONE1

Sets the BOP of all pipes in /ZONE1 to sit on the specified rack

BOP ALL

Repeat previously defined order sequence

Command Syntax

>-- BOP --+-- ALL -->
          |
          |-- <uval> --.   .-----<----.
          |            |  /           |
          ‘------------+-*-- <sgid> --+-->

Note:
No ordering takes place with the BOP command; it is expected that the BOP command is used after a spread.

In This Topic
TitleResults for “How to create a CRG?”Also Available in