Run More Clash Sets
- Last UpdatedMay 26, 2023
- 1 minute read
As the design of the 3D model continues, the scope of the existing Clash Set can be extended and/or more Clash Sets can be created and then run, as outlined above.
Note:
If the normal process of reading desclash output files and post-processing the data
and loading it into the Clash Manager database is interrupted or fails, the considerable
time already spent running desclash need not be wasted. The entire set of desclash
output files may be loaded, replacing any partially loaded. Alternatively, selected
files may be merged into the results of the last Clash Run. Initiate these actions
the AVEVA Clash Manager Configuration window - Manually Load Clash Files. Refer to Manually Load Clash Files for further information.