Title Block Area
- Last UpdatedAug 05, 2025
- 1 minute read
|
250 ‘DATE’ |
The actual date is appended automatically in the required format (refer to DATE). This Atext also uses Atexts 258 to 269, inclusive, if the date format is set to UK. |
|
251 ‘PROJECT NO’ |
Used if the project number is to be plotted (refer to PROJECTNUMBER). |
|
252 ‘BATCH REF’ |
The AVEVA E3D Design zone name is appended automatically. |
|
253 ‘PIPING SPEC’ |
The value of the attribute SPEC from the element PIPE is appended automatically. |
|
254 ‘ISS’ |
The value of the attribute REV (that is, the revision level) from the element PIPE is appended automatically. |
|
255 ‘DRG’ |
Used only when a pipe is split over multiple drawing sheets. This Atext is used in conjunction with Atext 256 (in the format DRG 1 OF 2) or with Atext 276 (in the format CONT. FROM DRG 1). |
|
256 ‘OF’ |
Used in conjunction with Atext 255. |
|
257 ‘SPL’ |
Denotes a Spool drawing. Sequential numbering, starting at 1 for each pipe, is appended automatically. |
|
258 ‘JAN’ 259 ‘FEB’ 260 ‘MAR’ 261 ‘APR’ 262 ‘MAY’ 263 ‘JUN’ 264 ‘JUL’ 265 ‘AUG’ 266 ‘SEP’ 267 ‘OCT’ 268 ‘NOV 269 ‘DEC’ |
258 ‘JAN’ to 269 ‘DEC’ All used in conjunction with Atext 250 (for UK date formats). |
|
270 ‘THERMAL INSULATION SPEC’ |
The value of the attribute ISPE of the element PIPE is appended automatically. |
|
271 ‘TRACING SPEC’ |
The value of the attribute TSPE of the element PIPE is appended automatically. |
|
272 ‘PAINTING SPEC’ |
The value of the attribute PTSP of the element PIPE is appended automatically. |