Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Head - Drive and Horizontal

  • Last UpdatedFeb 12, 2025
  • 2 minute read

Take-up

D1 - D5

Specify the pulley diameters.

E

Specifies the horizontal length from head pulley to take-up.

H1- H2

Specify the horizontal lengths between pulleys.

V1 - V3

Specify the vertical lengths between pulleys.

Counter Weight

Displays the graphical representation of the Counter Weight arrangement.

I

Specifies the Tower Width.

K

Specifies the Cable Distance.

L

Specifies the Distance From Pulley.

No OF BLOCKS

Specifies the Concrete Block Number.

Mirror Off/On

Mirrors the tower position about the conveyor centerline.

Next

Displays the orthogonal view of the counter weight arrangement.

A

Specifies the Bearing Center Distance.

B

Specifies the Bearing Backing.

C

Specifies the Concrete Block Length.

H

Specifies the Tower Height.

M

Specifies the Distance to Floor.

O

Specifies the Distance to Concrete Block.

W

Specifies the Width from Pulley.

Back

Displays a graphical representation of the counter weight arrangement.

Mirror Off/On

Mirrors the tower position about the conveyor centerline.

TitleResults for “How to create a CRG?”Also Available in