Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Material Lists for Split Pipelines

  • Last UpdatedAug 19, 2025
  • 1 minute read

Where a pipeline is split over two or more drawings, a separate material list is created for each drawing. The component serial numbering sequence restarts from 1 on the material list of each drawing sheet.

Note: The user can control how pipelines are split. Refer to Spool, which describes how split points are created in Model, and Split Long Pipelines, which describes how the user can control splitting in Isodraft.

TitleResults for “How to create a CRG?”Also Available in