Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Details Tab

  • Last UpdatedNov 02, 2022
  • 1 minute read

By default the Result window is displayed with the Details tab selected. The user can select the other tabs to display the concrete quantities calculations for the element types.

All the results generated by the Concrete Quantities application makes no allowance for construction sequence of formwork configuration.

In AVEVA E3D Design, a mass look-up is used to provide the surface area and volume of an object as follows:

Volume

=

!!CE.Nvol

Surface area

=

!!CE.NSrf

Calculating take off for a concrete civil engineering object can be defined as follows:

Net surface

=

Surface area above and below area

+

contour surface area

+

contour surface area of openings

-

Surface area above and below an opening (full penetration)

+

Surface area above and below an opening (limited penetration beneath)

+

Surface area below an opening (limited penetration above)

Net volume

=

Volume - Opening volume

Related Links
TitleResults for “How to create a CRG?”Also Available in