Suppressing Clash Repetition in Reports
- Last UpdatedFeb 19, 2025
- 1 minute read
Keywords
REPORT FIRST
Description
When used before an OUTPUT command, the REPORT FIRST option allows the user to generate a sequence of reports from a single set of clash data such that each clash is reported once only throughout the complete sequence.
Example |
|
|---|---|
|
REPORT FIRST ALL OUTPUT /ZONE.PIPES OUTPUT /ZONE.STEELW |
Assume a clash check has just been run which includes piping and steelwork items among the elements checked. Then this sequence generates two separate reports; the first (from OUTPUT /ZONE.PIPES) shows all clashes involving pipework elements, including those between pipework and steelwork; the second (from OUTPUT /ZONE.STEELW) shows all clashes involving steelwork elements except those which were included in the first report (i.e. the second report omits clashes between pipework and steelwork. |
Command Syntax
>--- REPort FIRst ALL --->