Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Unified Engineering

Element Positioning :MDSConfigA

  • Last UpdatedJan 24, 2023
  • 1 minute read

Enable Relative Element Positioning

Move Direction

Proportion of difference from Reference Duct

HVAC Relative Dimension

Value

TRUE

W

0.5

WIDTH

Description

Relative positioning required.

Offsets are in the WEST direction, relative to STRU orientation.

Bar is offset by 0.5 x (500 - HVAC dimension in relative direction, for example, WIDTH).

The HVAC dimension that is compared against the reference.

TitleResults for “How to create a CRG?”Also Available in