Map drawings to a subcontract task in a TMR

  • Last UpdatedMay 07, 2026
  • 1 minute read

Map drawings to a subcontract task added as a Technical Material Requisition (TMR) position. To map drawings, ensure you add a subcontract task item to the TMR. For more information, see Add non-catalogue items to a TMR.

  1. Navigate to the s50016 Technical Material Requisition screen.

  2. To refresh the screen, select the F5 key.

  3. In the Technical Material Requisition Header grid, select a row.

  4. In the Position grid, select the Technical Material Requisition Position tab.

  5. In the Technical Material Requisition Position grid, select a row.

    Ensure the selected TMR position is a subcontract (SC) task.

  6. In the Technical Material Requisition Position grid, select the Drawings tab.

  7. On the s50016 menu, in the Requisition Options group, select Drawings.

    The d0127 Relate Drawings dialog appears.

  8. To refresh the dialog, select the F5 key.

  9. In the Drawings grid, select the required drawings, and then select the Enter key.

    The selected drawings appear in the Selected Drawings grid.

  10. Select Insert.

    In the Drawings tab, the selected drawings appear.

  11. On the Home menu, in the Record group, select Save.

    The drawings are mapped to the subcontract task.