Create a level in a cost account breakdown structure
- Last UpdatedMay 07, 2026
- 1 minute read
Create a level in a cost account breakdown structure of a project.
-
Navigate to the s10005 Set-Up Cost Structure and Accounts screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the Levels and Cost Accounts section, select the project ID.
The Cost Accounts grid is updated with the data of all the cost accounts defined for the selected project.
-
Select anywhere in the Levels grid.
-
On the Home menu, in the Record group, select Create.
In the Levels grid, a row is created.
-
Enter the relevant details in the following fields:
-
Level Id: The unique ID of a level within a project.
-
Level Name: The name of the level within a project.
-
-
(Optional) Enter the relevant details in other fields as required. For more information on all the fields, see s10005 Field descriptions.
-
On the Home menu, in the Record group, select Save.
The level is created.