Update the external status of a fabricate
- Last UpdatedMay 07, 2026
- 2 minute read
When you create a fabricate, the default External Status of the fabricate is Preliminary. To use the fabricate in other screens, change the external status to Fully Validated.
-
Navigate to the s20017 Fabricate Catalogue screen.
-
In the Current Project control block, from the Project dropdown, select the required project ID.
-
To refresh the screen, select the F5 key.
-
In the Fabricate Catalogue grid, select a row.
-
On the s20017 menu, in the Status group, from the External Status dropdown, select one of the following:
-
Preliminary: Indicates the default status of the fabricate. At the Preliminary stage, the fabricate is not available for use throughout AVEVA Enterprise Resource Management.
-
Fully Validated: Indicates the fabricate is available for use throughout AVEVA Enterprise Resource Management.
-
Not to be Used: Indicates the fabricate is not available for use due to a temporary restriction (the supply of materials is restricted or alternatives are being evaluated) or a permanent hold (the material is obsolete). If the fabricate is already assigned to a Part List (PL) or a Purchase Order (PO), you can continue to use the fabricate. However, the fabricate is not available for addition to any new PL or PO.
-
Ready For Delete: Indicates you can delete the fabricate in case a clean up of the reference data is performed. At the Ready For Delete stage, the fabricate is not available for use throughout AVEVA Enterprise Resource Management.
-
-
(Optional) To revert the status update, on the s20017 menu, in the Status group, select Revert.
-
On the Home menu, in the Record group, select Save.
The External Status of the fabricate is updated.