Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

s22012 Field descriptions

  • Last UpdatedMay 07, 2026
  • 2 minute read

Common fields in the screen

Field

Description

SI

Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates.

Defined By

The ID of a user who created a record.

Defined At

The date and time when a record was created.

Updated By

The ID of a user who updated a record.

Updated At

The date and time when a record was updated.

Current Project control block

Field

Description

Project

The ID of a project related to a delivery designation.

Description

The description of a project related to a delivery designation.

Status

Indicates the status of a project. If the Status checkbox is selected, the project is available for use throughout AVEVA Enterprise Resource Management.

Template

Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations.

Delivery Designations grid

The following table describes the fields in the General tab.

Field

Description

Delivery Designation

The unique number to identify a delivery designation. Ensure you enter a whole number greater than zero.

Description

The description of a delivery designation.

Category

Indicates the category of the material required for a delivery designation. There are three values:

  • Fabrication: Indicates the material is required for fabrication activities.

  • Installation: Indicates the material is required for installation activities.

  • None: Indicates the material is not required for fabrication or installation activities.

Status

Indicates the status of a delivery designation. If the Status checkbox is selected, the delivery designation is available for use throughout AVEVA Enterprise Resource Management.

TitleResults for “How to create a CRG?”Also Available in