Copy a hull unit material list to a project

  • Last UpdatedFeb 11, 2025
  • 2 minute read

Copy a hull unit material list from the source project to a target project. Ensure the selected hull unit material list you want to copy has the same hull unit in the target project in the s30001 Hull Units screen.

  1. Navigate to the s30000 Hull Unit Material List screen.

  2. To refresh the screen, select the F5 key.

  3. In the Hull Unit Material List Header grid, select a hull unit material list you want to copy.

  4. On the s30000 menu, in the Copy group, select To Project.

    The d0037 Copy Hull Unit Material List to Project dialog appears.

  5. From the Target Project dropdown, select the ID of the target project.

  6. (Optional) In the Options section, perform any of the following:

    • To make the hull unit material list items available for construction, select the For Construction checkbox.

      In the target project, in the copied hull unit material list, the For Construction checkbox is selected for the hull unit material list items.

    • To include the hull unit material list items as a requisition in a part list, a Delivery Request List (DRL), and a picking list in the target project, select the For Requisition checkbox.

      In the target project, in the copied hull unit material list, the For Requisition checkbox is selected for the hull unit material list items.

  7. In Hull Unit Materials to Copy section, select one of the following:

    • All: To copy all the hull unit material lists from the source project to the target project.

    • Selected: To copy only the selected hull unit material list from the source project to the target project.

  8. To validate the hull unit material list copy, select Test.

    A pop-up window displaying the test result appears.

  9. Perform one of the following as required:

    • If the validation is successful, select Ok.

      The pop-up window closes.

    • If the validation is not successful, select Ok, and select the Details tab for more information. Perform the necessary actions and validate the schedule copy again.

  10. Select Copy.

    The number of hull unit material lists and items that are copied, not copied, and included in the copy are listed in the Summary tab. For more information, see the Details tab.

    The hull unit material list is copied from the source project to the target project.

  11. To close the d0037 Copy Hull Unit Material List to Project dialog, select Exit.

  12. (Optional) To modify the copied hull unit material list according to your requirements, perform the following:

    1. To refresh the screen, select the F5 key.

    2. In the Hull Unit Material List Header grid, select the hull unit material list copy, and modify according to your requirements.

    3. To save the changes, on the Home menu, in the Record group, select Save.