Update the number setup method for a project
- Last UpdatedMay 07, 2026
- 1 minute read
For a project, update the setup method for the IDs of a Technical Material Requisition (TMR), Purchase Order (PO), Request For Quote (RFQ), or Purchase Agreement (PA). The number setup method is project-specific.
-
Navigate to the s50030 Project Purchasing Setup screen.
-
To refresh the screen, select the F5 key.
-
In the Projects grid, select a row.
-
Select the General tab and perform any of the following as required:
-
To update the setup method for the PO ID, from the Project PO Number Setup Method dropdown, select the required setup method.
-
To update the setup method for the TMR ID, from the Project TMR Number Setup Method dropdown, select the required setup method.
-
To update the setup method for the PA ID, from the Project PA Number Setup Method dropdown, select the required setup method.
-
To update the setup method for the RFQ ID, from the Project RFQ Number Setup Method dropdown, select the required setup method.
-
-
To save the changes, on the Home menu, in the Record group, select Save.