s23002 Field descriptions

  • Last UpdatedMay 07, 2026
  • 3 minute read

Common fields in the screen

Field

Description

SI

Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates.

Defined By

The ID of a user who created a record.

Defined At

The date and time when a record was created.

Updated By

The ID of a user who updated a record.

Updated At

The date and time when a record was updated.

Current Project control block

Field

Description

Project

The ID of a project related to a material allocation package.

Description

The description of a project related to a material allocation package.

Status

Indicates the status of a project. If the project is closed, you cannot update any information for the material allocation package.

Template

Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations.

Material Allocation Package grid

The following table describes the fields in the General tab.

Field

Description

Material Allocating Package

The unique ID of a material allocation package.

Description

The description of a material allocation package.

Status

Indicates the status of a material allocation package. If the Status checkbox is selected, the material allocation package is available for use throughout AVEVA Enterprise Resource Management.

Priority

The priority number assigned to a material allocation package.

Requirement Date

The date when the items in a material allocation package are required on site.

Filter on MTO Line Items

Indicates only the site Material Take-Off (MTO) items that match the filter criteria are included in a material allocation package. If the Filter on MTO Line Items checkbox is cleared, then the entire MTO included in the filter criteria is included in the material allocation package.

Filter

The filter criteria to select site MTOs for a material allocation package.

Manually assigned Site MTOs grid

The following table describes the fields in the General tab.

Field

Description

MTO Identification

The ID of a site MTO included in a material allocation package.

Discipline

The ID of a drawing discipline related to a site MTO included in a material allocation package.

Construction Area

The ID of a construction area related to a site MTO included in a material allocation package.

Drawing No

The drawing number related to a site MTO included in a material allocation package.

Material Control Section

The ID of a material control section related to a site MTO included in a material allocation package.

MTO-Line

The ID of a pipeline or a material control section for which a site MTO is created.

Sheet Number

The sheet number in a drawing related to a site MTO included in a material allocation package.

Delivery Designation

The ID of a delivery designation related to a site MTO included in a material allocation package.

Site Id

The ID of a site related to a site MTO included in a material allocation package.

Main Size

The main size of a pipeline related to a site MTO included in a material allocation package.

Priority

The priority number assigned to a site MTO included in a material allocation package.

MTO Production Date

The start date of the activity related to a site MTO included in a material allocation package

Site MTO Start Date

The start date of a site MTO included in a material allocation package.