s23002 Field descriptions
- Last UpdatedMay 07, 2026
- 3 minute read
Common fields in the screen
|
Field |
Description |
|---|---|
|
SI |
Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates. |
|
Defined By |
The ID of a user who created a record. |
|
Defined At |
The date and time when a record was created. |
|
Updated By |
The ID of a user who updated a record. |
|
Updated At |
The date and time when a record was updated. |
Current Project control block
|
Field |
Description |
|---|---|
|
Project |
The ID of a project related to a material allocation package. |
|
Description |
The description of a project related to a material allocation package. |
|
Status |
Indicates the status of a project. If the project is closed, you cannot update any information for the material allocation package. |
|
Template |
Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations. |
Material Allocation Package grid
The following table describes the fields in the General tab.
|
Field |
Description |
|---|---|
|
Material Allocating Package |
The unique ID of a material allocation package. |
|
Description |
The description of a material allocation package. |
|
Status |
Indicates the status of a material allocation package. If the Status checkbox is selected, the material allocation package is available for use throughout AVEVA Enterprise Resource Management. |
|
Priority |
The priority number assigned to a material allocation package. |
|
Requirement Date |
The date when the items in a material allocation package are required on site. |
|
Filter on MTO Line Items |
Indicates only the site Material Take-Off (MTO) items that match the filter criteria are included in a material allocation package. If the Filter on MTO Line Items checkbox is cleared, then the entire MTO included in the filter criteria is included in the material allocation package. |
|
Filter |
The filter criteria to select site MTOs for a material allocation package. |
Manually assigned Site MTOs grid
The following table describes the fields in the General tab.
|
Field |
Description |
|---|---|
|
MTO Identification |
The ID of a site MTO included in a material allocation package. |
|
Discipline |
The ID of a drawing discipline related to a site MTO included in a material allocation package. |
|
Construction Area |
The ID of a construction area related to a site MTO included in a material allocation package. |
|
Drawing No |
The drawing number related to a site MTO included in a material allocation package. |
|
Material Control Section |
The ID of a material control section related to a site MTO included in a material allocation package. |
|
MTO-Line |
The ID of a pipeline or a material control section for which a site MTO is created. |
|
Sheet Number |
The sheet number in a drawing related to a site MTO included in a material allocation package. |
|
Delivery Designation |
The ID of a delivery designation related to a site MTO included in a material allocation package. |
|
Site Id |
The ID of a site related to a site MTO included in a material allocation package. |
|
Main Size |
The main size of a pipeline related to a site MTO included in a material allocation package. |
|
Priority |
The priority number assigned to a site MTO included in a material allocation package. |
|
MTO Production Date |
The start date of the activity related to a site MTO included in a material allocation package |
|
Site MTO Start Date |
The start date of a site MTO included in a material allocation package. |