Open the picking list related to a material allocation package
- Last UpdatedMay 07, 2026
- 1 minute read
Open the picking list related to a material allocation package in the s60031 Picking Lists screen. You can view all the picking lists that hold items created for any site Material Take-Off (MTO) item related to the material allocation package.
-
Navigate to the s23002 Material Allocation Package screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the Material Allocation Package grid, select a row.
-
On the s23002 menu, in the Reservations group, from the Reservation Details dropdown, select Goto Picking List.
The s60031 Picking Lists screen appears. In the Picking List grid, view the picking list related to the site MTO included in the material allocation package. In the Line Items grid, in the Items tab, view the related picking list items.