Substitute a hull material DRL item

  • Last UpdatedMay 07, 2026
  • 1 minute read

Substitute a hull material Delivery Request List (DRL) item with an approved substitute material. If a material in the hull material DRL is not available, you can substitute the material with an available material.

Prerequisites

Before you begin, complete the following:

  • Ensure a material substitution is approved for the material, for the project related to the hull material DRL.

  • Ensure the status of the hull material DRL is DRL Not Completed.

To substitute a hull material DRL item

  1. Navigate to the s30003 Hull Material Delivery Request List screen.

  2. To refresh the screen, select the F5 key.

  3. In the Hull Material Delivery Request List grid, select a row.

  4. In the Hull Material Delivery Request List Item grid, select the hull material DRL item you want to substitute.

  5. On the s30003 menu, in the Add Positions group, select Material Substitutions.

    The d0269 Material Substitutions dialog appears.

  6. To refresh the dialog, select the F5 key.

  7. In the Approved Substitutions grid, select a substitute material.

  8. Select Substitute.

    The substitute material appears in the Hull Material Delivery Request List Item grid.

  9. (Optional) Enter the relevant details in other fields as required. For more information on all the fields, see s30003 Field descriptions.

  10. On the Home menu, in the Record group, select Save.

    The selected hull material DRL item is substituted.