Update a TMR from s22060
- Last UpdatedMay 07, 2026
- 2 minute read
You can update an approved Technical Material Requisition (TMR) by raising a revision of the TMR. For more information, see Raise the revision of a TMR.
-
Navigate to the s22060 Engineering Material Control screen.
-
In the Current Project control block, perform the following:
-
From the Project dropdown, select the ID of the required project.
-
From the Requisition dropdown, select the ID of the required MR.
-
-
To refresh the screen, select the F5 key.
-
On the s22060 menu, in the Actions group, select Create/Update TMR.
The d0207 Raise Revision dialog appears.
-
ln the Revision section, in the Revision field, enter a revision number.
-
In the Content section, from the Difference Types dropdown, select any of the following:
-
To add materials found through the MR filter with a negative balance compared to the quantities in the existing TMR positions, select Req above TMR Qty.
-
To add materials found through the MR filter with a positive balance, which exceeds the rounding increment set in the s40002 Working Surplus Contingency screen, select TMR Qty above Req.
-
To add all the materials found through the MR filter, select All Requirements.
The existing TMR positions are overwritten
-
-
In the Content section, select one of the following:
-
To add the new requirements as new TMR positions, select Append.
-
To update the existing requirements with all the changes from the new requirements, select Merge.
-
-
To include the requirements for which the entire quantity is on hold, select the On Hold Lines checkbox.
-
In the Documents section, select any of the following:
-
To include the documents related to the material, select Include Documents.
-
To include the attachments related to the material, select Include Attachments.
-
-
Select Continue.
The s50016 Technical Material Requisition screen appears.
-
(Optional) Modify the TMR according to your requirements.
-
To save the changes, on the Home menu, in the Record group, select Save.