View the fabricate balance
- Last UpdatedMay 07, 2026
- 1 minute read
View the real-time balance of a fabricate based on the number of fabricates required and the total number of fabricates available on a site related to a material transaction. For example, for a fabricate, if the material status code is WO and the material transaction is related to a work order, view the number of fabricates required on a site and the number of fabricates available on the site related to the work order. If the material status code is PL and the material transaction is related to a part list, view the number of fabricates required on a site and the total number of fabricates available on the site related to the drawing of the part list.
For the fabricates that are defined as a replacement for a standard material or a project component in the s20017 Fabricate Catalogue screen, view the balance of the standard material or the project component.
-
Navigate to the s21004 Relate Fabricates to Work Order screen.
-
In the Current Project control block, from the Project dropdown, select the ID of a project related to a fabricate.
-
To refresh the screen, select the F5 key.
-
Select the Fabricates tab, in the Fabricates grid, select a row.
-
In the Fabricate Balance grid, view the real-time balance of the selected fabricate.