Overwrite a material allocation package

  • Last UpdatedMay 07, 2026
  • 1 minute read

Overwrite the contents of a material allocation package to determine whether a specific site Material Take-Off (MTO) item is included in or excluded from the material allocation package.

  1. Navigate to the s23002 Material Allocation Package screen.

  2. In the Current Project control block, from the Project dropdown, select the ID of the required project.

  3. To refresh the screen select the F5 key.

  4. In the Material Allocation Package grid, select a row.

  5. On the s23002 menu, in the Actions group, select Select Line Items.

    The d0402 Select line items to include/exclude dialog appears.

  6. In the grid, select a row.

  7. From the Rule dropdown, select one of the following:

    • Exclude: To exclude a site MTO item from the material allocation package.

    • Include: To include a site MTO item in the material allocation package.

  8. Select Ok.

    The material allocation package is modified.