Purchasing View Tab
In the Material grid, the following table describes the fields in the Material tab.
|
Field |
Description |
|---|---|
|
SI |
Status Indicator: Indicates the status of the record related to validation errors, warnings, and updates. |
|
S |
Status: Indicates the amount in purchase order compared to the requirements. There are three statuses:
|
|
TMR Quantity |
The total Technical Material Requisition (TMR) quantity requested for transfer to a TMR. |
|
A |
Alarm: Indicates the status for a material is critical. The alarm is on if the the requirements are higher than the available material holding. |
|
LC |
Location Critical: Indicates the stock holding for a material in one or more sites are critical. |
|
On PA |
On Purchase Agreement: Identifies the Purchase Agreement related to a material. |
|
Project |
The ID of a project related to a material. |
|
MC |
Material Code: Indicates the material code of a material. |
|
Item Id |
The ID of a material in a TMR position. MC field input is required for list-of-values of item ID to be available. |
|
Main Item Id |
The ID of a project component or fabricate which has been broken down into supplementary items. |
|
SMC |
Standard Material Category: Indicates whether a material is controlled as a standard stock material or a project related material. The valid categories are defined and maintained in the s20011 Standard Materials screen. |
|
Description |
The description of a material. |
|
Class |
The material classification code of a material. |
|
Buyer Group |
The group of purchasers responsible for procuring a requisitioned item. |
|
Mat Type |
Material Type: The grouping of a material, for example pipe, cables, and so on. |
|
Dimension |
The dimension of a material. |
|
Type description |
The description of the Material Type. |
|
Supplier |
The ID of the preferred supplier for a requisitioned material. The field value is blank for materials that have SMC value as P. |
|
Site Id |
The unique ID of the site where the requisitioned items are procured. The site ID related to the information in LT and PO Date fields. |
|
LT |
Lead Time: The time taken to receive materials from a supplier after an order is placed. |
|
PO Date |
The purchase date for a material. The purchase date is calculated as critical date minus lead time. |
|
Date |
The first critical date for material requirements across all sites. |
|
Open PO |
Indicates the material exists in a purchase order in status Create/Changed or Approval. |
|
Exists TMR |
Indicates the material exists in a TMR position which is not related to a purchase order. |
In the Site grid, the following table describes the fields in the General tab.
|
Field |
Description |
|---|---|
|
A |
Alarm: Indicates the status for a material is critical. The alarm is on if the the requirements are higher than the available material holding. |
|
Site Id |
The unique ID of the site where the requisitioned items are procured. |
|
Balance |
The quantity of remaining material for each site in comparison to the material requirements. The balance is calculated as negative quantities from requirements and positive quantities from closed purchase orders. |
|
Not Requisition qty |
The sum of the material quantity with FR checkbox as cleared in the Material Balance tab. |
|
Supplier |
The ID of the preferred supplier for a requisitioned material. |
|
Supplier Name |
The company name of a supplier. |
|
SMC |
Standard Material Category: Indicates whether a material is controlled as a standard stock material or a project related material. The valid categories are defined and maintained in the s20011 Standard Materials screen. |
|
Buyer Group |
The group of purchasers responsible for procuring a requisitioned item. |
|
ROP |
Reorder Point: The standard material stock level when the material is reordered. The ROP for a standard material is defined in the s20011 Standard Materials screen. |
|
ROQ |
Reorder Quantity: The quantity of standard material to be reordered at the ROP. The ROQ for a standard material defined in the s20011 Standard Materials screen. |
|
LT |
Lead Time: The time taken to receive materials from a supplier after an order is placed. |
|
PO Date |
The purchase date for a material. The purchase date is calculated as critical date minus lead time. |
|
Date |
The first critical date for material requirements across all sites. |
In the Material Balance grid, the following table describes the fields in the Material Balance tab.
|
Field |
Description |
|---|---|
|
MS-code |
Material Status Code: The material transaction code of the material to determine the nature of the material transaction. For example, the MS-code is TMR for the expected material from a TMR with Closed status. The MS-code is defined in the s50008 Material Status Code screen. |
|
Site |
The unique ID of the site where the requisitioned items are procured. |
|
Transaction Id |
The code to identify a material transaction. |
|
System |
The ID of the system related to a material. |
|
FR |
For Requisition: Indicates a material exists as a requisition in a part list, a Delivery Request List (DRL), or a picking list. |
|
Activity |
The ID of the activity related to a material. |
|
Cor |
Activity Correction Time: The correction time related to the start date of an activity. |
|
Date |
The date a material is expected to become available. |
|
Quantity |
The quantity of the material requirement at a particular site. |
|
BBQ |
Buyer's Balance Quantity: The quantity of material that contributes to the material balance. |
|
Balance |
The quantity of remaining material for each transaction in comparison to the material requirements. |
|
TMR Quantity |
The TMR quantity requested for transfer to a TMR. |
Requisitioning View Tab
The following table describes the fields in the Search Planned Requisitions Control Block.
|
Field |
Description |
|---|---|
|
Project |
The ID of a project related to a Material Requisitions (MR). |
|
MR Number |
Material Requisition Number: The ID of the MR for which related materials are searched. The MR numbers are defined in the s40001 Requisition Register screen. |
|
All |
Indicates to display all over-requisitioned and under-requisitioned materials. If the All checkbox is selected, the Req Status difference dropdown is not available. |
|
Req Status difference |
Indicates the material requisition type that is searched. There are three types:
|
In the Materials grid, the following table describes the fields in the General tab.
|
Field |
Description |
|---|---|
|
RS |
Requisition Status: Indicates the requisition status of a material. There are three statuses:
|
|
Project |
The ID of a project related to a material. |
|
Site |
The unique ID of the site where the requisitioned items are procured. |
|
MC |
The material code for a material. |
|
Item Id |
The code to identify a material in a TMR position. |
|
Description |
The description of a material. |
|
Group/Split Col 1-5 |
The grouping of requisitioned materials by up to five attributes. The grouping attributes are defined in the d0228 MR Filter Builder dialog from the s40001 Requisition Register screen. |
|
Dimension |
The dimension of a material. |
|
TMR Balance |
The material balance between the required quantity and the requisitioned quantity. |
|
Unit |
The unit of measurement of a material quantity. |
|
TMR Qty |
The TMR quantity requested for transfer to a TMR. |
|
Total Rqmt |
The required material quantity that includes working surplus and contingency quantity. |
|
PC Qty |
The required material quantity from the estimated quantity (Est Qty) field in the s20010 Project Components screen. |
|
On Hold Qty |
The engineering on hold material quantity from a Material Take-Off (MTO) or a Part List. |
|
Adjustment |
The adjustment to be made to a Total Take-Off quantity. |
|
Adj %-age |
The percentage of the adjustment to be made to a Total Take-Off quantity. |
|
MTO Qty |
The required material quantity that excludes working surplus and contingency quantity. |
|
Wrk Surplus |
The working surplus quantity to be requisitioned with an MTO quantity. The working surplus quantity covers additional material requirement due to wastage. The rules to calculate working surplus quantity are defined in the s40002 Working Surplus Contingency screen. |
|
Contingency |
The contingency quantity to be requisitioned with an MTO quantity. The contingency quantity covers additional material requirements due to any inaccuracies in the requirement quantity. The rules to calculate contingency quantity are defined in the s40002 Working Surplus Contingency screen. |
|
Rounding Qty |
The rounded required material quantity. The rules to calculate rounding are defined in the s40002 Working Surplus Contingency screen. |
|
Estimated Qty |
The total material requirement from an Advance Bill of Material or the estimated material requirements for project components from a project component catalogue. |
|
SMC |
Standard Material Category: Indicates whether a material is controlled as a standard stock material or a project related material. The valid categories are defined and maintained in the s20011 Standard Materials screen. |
|
Class |
The material classification code of a material. |
|
Buyer Group |
The group of purchasers responsible for procuring a requisitioned item. |
|
Mat Type |
Material Type: The grouping of a material, for example pipe, cables, and so on. |
|
Type |
The type of a material or a component defined in their respective catalogues. |
|
Supplier |
The ID of the preferred supplier for a requisitioned standard material. The supplier ID is defined in the s20011 Standard Materials screen. |
In the Material Balance grid, the following table describes the fields in the Material Balance tab.
|
Field |
Description |
|---|---|
|
MS-code |
Material Status Code: The material transaction code of the material to determine the nature of the material transaction. For example, the MS-code is TMR for the expected material from a TMR with Closed status. The MS-code is defined in the s50008 Material Status Code screen. |
|
Site |
The unique ID of the site where the requisitioned items are procured. |
|
Transaction Id |
The code to identify a material transaction. |
|
System |
The ID of the system related to a material transaction. |
|
Activity |
The ID of the activity related to a material. |
|
Cor |
Activity Correction Time: The correction time related to the start date of an activity. |
|
Date |
The date when the material is expected to become available. |
|
On Hold Qty |
The engineering on hold material quantity from a Material Take-Off (MTO) or a part list. |
|
Quantity |
The quantity of the material requirement at a particular site. |
|
Unit |
The unit of measurement of a material. |