Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

s22008 Field descriptions

  • Last UpdatedMay 07, 2026
  • 2 minute read

Common fields in the screen

Field

Description

SI

Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates.

Defined By

The ID of a user who created a record.

Defined At

The date and time when a record was created.

Updated By

The ID of a user who updated a record.

Updated At

The date and time when a record was updated.

Current Project control block

Field

Description

Project

The ID of the project an MTO type is related to.

Description

The name of a project.

Status

Indicates the status of a project. If the project is closed, then you cannot update any information for the MTO type.

Template

Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations.

MTO Types grid

The following table describes the fields in the General tab.

Field

Description

Discipline

The drawing discipline of an MTO Type. If a discipline is specified for an MTO type, the MTO type is available only for MTO lines of the specified drawing discipline. If no discipline is specified for the MTO type, the MTO type is available for all disciplines. For information on discipline codes, see s20015 Drawing Disciplines.

MTO Type

The unique code to identify an MTO.

Description

The description of an MTO type.

Sequence Number

The unique numeric sequence for an MTO type. When creating an MTO type in a new project, ensure to create one MTO type with Sequence as 0 and Quality as None. Ensure the Estimate MTO quality sequence is followed by Actual MTO quality sequence. For example, if the highest Estimate MTO quality sequence is 5, then the Actual MTO quality sequence begins with 6 and is followed by 7, 8, and so on.

MTO Quality

The quality of an MTO type. The different qualities are:

  • Actual: For an MTO type with approved estimate quantity.

  • Estimate: For an MTO type with estimated quantity.

  • None: For an MTO type with Sequence as 0.

For Actual and Estimate MTO quality, ensure the sequence number is greater than zero.

Status

Indicates the status of an MTO type. If the Status checkbox is selected, the MTO type is available for use throughout AVEVA Enterprise Resource Management.

Site MTO Creation

Indicates you can create or update site MTOs related to an MTO type. The three values are:

  • Yes: Creates site MTOs related to the MTO type.

  • Yes, Forecast Only: Creates site MTOs related to the MTO type, only for allocation runs with Process Type as Forecast Only defined in s23003 Material Allocation Run screen. For information on allocation runs, see s23003 Material Allocation Run.

  • No: Does not create site MTOs related to the MTO type.

Allow Site MTO Adjustments

Indicates you can modify site MTOs related to an MTO type. If the Allow Site MTO Adjustments checkbox is selected, you can modify site MTOs in s23001 Site MTO screen.

Related Links
TitleResults for “How to create a CRG?”Also Available in