Update the category of a standard material
- Last UpdatedMay 07, 2026
- 2 minute read
Update the category of a standard material to either standard stock material or project specific material. For a standard material, if the value in the Material Category field is 1,2, or 3, then the standard material is controlled and reserved for a specific project. If the value in the Material Category field is 4, 5, or 6, then the standard material is used across all projects as a standard stock material.
Prerequisites
Before you begin, complete the following:
-
Ensure the company-wide stock holding for the selected standard material is 0.
-
In the 20011 Standard Materials screen, in the Site tab, ensure the AVMS checkbox is cleared for the selected standard material.
To update the category of a standard material
-
Navigate to the s20014 Change Standard Material Category screen.
-
To refresh the screen, select the F5 key.
-
In the Standard Material grid, select a row.
-
On the s20014 menu, perform one of the following:
-
To update the standard material category to standard stock material, in the Standard stock group, perform one of the following:
-
To update the standard material category to stocked standard stock material, select SMC to Stocked article. The value in the Material Category field is updated to 4.
-
To update the standard material category to non-stocked standard stock material, select SMC to Non-Stocked article. The value in the Material Category field is updated to 5.
-
To update the standard material category to free-stocked standard stock material, select SMC to Free-Stocked article. The value in the Material Category field is updated to 6.
-
-
To update the standard material category to project specific material, in the Project Material group, perform one of the following:
-
To update the standard material category to first project specific standard material, select SMC to First (1) project specific. The value in the Material Category field is updated to 1.
-
To update the standard material category to second project specific standard material, select SMC to Second (2) project specific. The value in the Material Category field is updated to 2.
-
To update the standard material category to third project specific standard material, select SMC to Third (3) project specific. The value in the Material Category field is updated to 3.
-
-
-
To save the changes, on the Home menu, in the Record group, select Save.