Update the dispatch details of an MMT
- Last UpdatedMay 07, 2026
- 1 minute read
A dispatch is performed when the movement of an expedite item from a supplier to a location is authorized. Update the dispatch details of a Material Movement Ticket (MMT), where the expedite items allocated to the MMT are not yet dispatched.
-
Navigate to the s51006 Material Movement Ticket screen.
-
In the Current Project control block, from the Project dropdown, select the required project ID.
-
To refresh the screen, select the F5 key.
-
In the Material Movement Ticket grid, select a row.
-
In the Expediting Items grid, select the Allocated tab, and select a row.
-
On the s51006 menu, in the MMT Options group, from the Workflow dropdown, select Dispatch All.
In the General tab, the Actual Dispatch Date, the Approver, and the Approved Date fields of the MMT are updated.
-
(Optional) To undo the workflow update, on the s51006 menu, in the MMT Options group, from the Workflow dropdown, select Undo workflow actions.
-
To save the changes, on the Home menu, in the Record group, select Save.