Create a process area
- Last UpdatedMay 07, 2026
- 1 minute read
Use a process area to define an area where pipelines are constructed. For example, you can create a process area called CONSTRUCT-A1 where a pipeline PIPE-01 is constructed based on the design conditions of the pipeline.
-
Navigate to the s22001 Process Areas screen.
-
In the Current Project control block, from the Project dropdown, select the required project ID.
-
To refresh the screen, select the F5 key.
-
On the Home menu, in the Record group, select Create.
In the Process Areas grid, a blank row is created.
-
Select the General tab and enter the relevant details in the following fields:
-
Process Area Code: The unique code of a process area.
-
Description: The description of the process area.
-
-
On the Home menu, in the Record group, select Save.
The process area is created.