Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

Reset the adjustments made to an MR

  • Last UpdatedMay 07, 2026
  • 1 minute read

Reset the adjustments made to the quantity of a material in a Material Requisition (MR).

  1. Navigate to the s22060 Engineering Material Control screen.

  2. In the Current Project control block, perform the following:

    1. From the Project dropdown, select the ID of the required project.

    2. From the Requisition dropdown, select the ID of the required MR.

  3. To refresh the screen, select the F5 key.

  4. In the Material Control grid, select a row.

  5. On the s22060 menu, in the Actions group, select Reset.

    The adjustments made to the quantities of the selected material are removed. In the Material Control grid, in the General tab, the values in the Total Take-off Quantity, the Balance, the Project MTO Quan, the New Quantity To TMR, the MTO+WS&C+Over Order Adj, and the New Qty To TMR (Before over order) fields are reset.

TitleResults for “How to create a CRG?”Also Available in