Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

Compare two design revisions

  • Last UpdatedMay 07, 2026
  • 1 minute read

Select and compare two design revisions.

  1. Navigate to the s21027 Discipline MTO/ Part List Revisions screen.

  2. In the Current Project control block, perform the following:

    1. From the Discipline dropdown, select the ID of the required drawing discipline.

    2. From the Project dropdown, select the ID of the required project.

  3. To refresh the screen, select the F5 key.

  4. On the s21027 menu, in the Actions group, select Compare Revision.

    The d0284 Compare Mto Revisions dialog appears.

  5. In the Revision Version Selection section, perform the following:

    1. From the From Revision dropdown, select the required revision number.

    2. From the To Revision dropdown, select the required revision number.

    Ensure the revision number in the From Revision field is less than the revision number in the To Revision field.

  6. Select Compare.

    In the grid, view the comparison between the revisions selected in the From Revision and To Revision fields.

  7. To close the d0284 Compare Mto Revisions dialog, select Ok.

TitleResults for “How to create a CRG?”Also Available in