AVEVA Enterprise Resource Management

s21026 Field descriptions

  • Last UpdatedMay 07, 2026
  • 5 minute read

Common fields in the screen

Field

Description

SI

Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates.

Defined By

The ID of a user who created a record.

Defined At

The date and time when a record was created.

Updated By

The ID of a user who updated a record.

Updated At

The date and time when a record was updated.

Defined Application

The ID of an application that defined a material summary.

MTO-Line

The ID of a specific section of a pipeline or material control section within a construction area.

Project control block

Field

Description

Project

The ID of a project.

Description

The description of a project.

Status

Indicates the status of a project. If the project is closed, you cannot update any information for the material summary.

Summaries grid

The following table describes the fields in the General tab.

Field

Description

Id

The ID of a material summary.

Revision

The revision number of a material summary.

Status

The status of a material summary. The status is automatically updated through the workflow actions. When you issue a material summary, the status changes from Open to Issued. The values are:

  • Open: The material summary is open for updates.

  • Issued: The material summary is issued and not open for updates.

Purpose

The ID of the purpose of a material summary. A material summary purpose categorizes material summaries based on the intended use of a material summary. A material summary purpose is defined in the s21025 Material Summary Purposes screen.

Description

The description of a material summary.

Content Updated at

The date and time when a material summary was updated.

Discipline

The drawing discipline related to a material summary.

Project Phase

The ID of a project phase related to a material summary. A project phase indicates the maturity of the Material Take-Offs (MTOs) or part lists included in a material summary. The project phase also determines which surplus and working contingency rules to apply to a material summary when phase specific rules are in use.

Remark

The comments related to a material summary.

Filter

The filter criteria to select site MTOs or part lists for a material summary.

Summary Content grid

In the MTO/Part Lists tab, in the MTO/Part Lists grid, the following table describes the fields in the General tab.

Field

Description

Status

Indicates the MTO items are included in a material summary.

Assign Method

The method through which an MTO is included in a material summary. You can add an MTO to a material summary through a filter or manually. If MTOs are added to a material summary through a filter as well as manually, then the value in the Assign Method field is Manually. The values are:

  • Filter: To add MTOs to a material summary through a filter.

  • Manually: To add MTOs to a material summary manually.

Summary Version

The version of an MTO included in a material summary.

Construction Area

The ID of a construction area related to an MTO included in a material summary.

Drawing No

The drawing number related to an MTO included in a material summary.

Current Version

The version number of an MTO included in a material summary.

Sheet Number

The drawing sheet number related to an MTO included in a material summary.

MTO Type

The ID of an MTO type related to an MTO included in a material summary.

Discipline

The drawing discipline related to an MTO included in a material summary.

In the Materials tab, in the Materials grid, the following table describes the fields in the General tab.

Field

Description

Material Id

The ID of an item included in a material summary.

MC

Material Category: The material category related to an item included in a material summary.

Description

The description of an item included in a material summary.

Site Id

The ID of a site related to an item included in a material summary.

Mto Qty

The quantity of an item in all the MTOs included in a material summary. The value in the Mto Qty field does not include MTO quantities on hold.

Hold Qty

The quantity of an item on hold in all the MTOs included in a material summary.

Total Summary Qty

The total quantity of an item included in a material summary. The value in the Total Summary Qty field includes the value in the Mto Qty field and any adjustments made through the values in the Working Surplus and the Contingency fields.

Adjustment Qty

The quantity of an item added to or removed from the value in the Mto Qty field.

Adjustment

The percentage of the quantity of an item added to or removed from the value in the Mto Qty field.

Working Surplus

The working surplus quantity of an item added to the value in the Mto Qty field based on the settings defined in the s40002 Working Surplus Contingency screen.

Contingency

The contingency quantity of an item added to the value in the Mto Qty field based on the settings defined in the s40002 Working Surplus Contingency screen.

Rounding

The quantity of an item added to the value in the Mto Qty field other than the working surplus and the contingency quantities to make the value in the Total Summary Qty field adhere to the rounding rules defined for the material class defined in the s40002 Working Surplus Contingency screen.

Remark

The comments related to an item included in a material summary.

In the Materials tab, in the Materials grid, the following table describes the fields in the Usage tab.

Field

Description

S

Status: Indicates the item is included in the summary quantity.

Construction Area

The ID of a construction area related to an MTO included in a material summary.

MTO-Line

The ID of a specific section of a pipeline or material control section within a construction area.

Drawing No

The drawing number related to an MTO item included in a material summary.

Sheet No

The drawing sheet number related to an MTO item included in a material summary.

Dis

Discipline: The engineering discipline related to an MTO item included in a material summary.

MTO Type

The ID of an MTO type related to an MTO item included in a material summary.

Line No

Part list line number: The line number related to an MTO item included in a material summary.

Quantity

The quantity of an item in an MTO revision included in a material summary.

Hold Qty

Hold quantity: The quantity of an item on hold in an MTO revision included in a material summary.

Unit

The unit of measure in which items are measured in stock.

Fabricate

The fabricate for which an item is required.