Add a subcontracted task to an inspection request

  • Last UpdatedMay 07, 2026
  • 1 minute read

Add a subcontracted task from the s50052 Subcontract Work Catalogue screen to an inspection request.

Prerequisites

Before you begin, complete the following:

  • Ensure the Inspection checkbox is selected for the task in the s50052 Subcontract Work Catalogue screen.

  • Ensure the status of the inspection request is Open.

To add a subcontracted task to an inspection request

  1. Navigate to the s52018 Inspection Request screen.

  2. In the Current Project control block, from the Project dropdown, select the ID of the project related to an inspection request.

  3. To refresh the screen, select the F5 key.

  4. In the Inspection Request grid, select a row.

  5. Select the Act Details tab.

  6. On the s52018 menu, in the Add Insp Details group, from the Add Insp Details dropdown, select Subcontract.

    The d0341 Subcontract Work Multi Item Select dialog appears.

  7. To refresh the dialog, select the F5 key.

  8. In the Subcontract Work grid, select one or more rows, and then select the Enter key.

    In the Selected Items grid, the selected items appear.

  9. In the Selected Items grid, in the Quantity field, enter the required quantity for each subcontracted task.

  10. Select Insert.

    In the Act Details tab, the selected subcontracted tasks appear.

  11. (Optional) Enter the relevant details in other fields as required. For more information on all the fields, see s52018 Field descriptions.

  12. On the Home menu, in the Record group, select Save.

    The selected subcontracted tasks are added to the inspection request.