Apply supply responsibility to a fabricate part list
- Last UpdatedMay 07, 2026
- 1 minute read
A supply responsibility rule defines the default setting for the For Construction and the For Requisition checkboxes of a fabricate part list item, as defined in the s21018 Supply Responsibility Matrix screen. For example, you can define a rule that all materials used at a specific site is to be purchased and handled entirely by a subcontractor. Based on the supply responsibility rule defined in the Supply Responsibility field, the For Construction and the For Requisition checkboxes of the fabricate part list item are updated.
-
Navigate to the s21015 Fabricate Part Lists screen.
-
To refresh the screen, select the F5 key.
-
In the Part Lists grid, select a row.
-
On the s21015 menu, in the Options group, select Apply Supply Responsibility.
In the Part List Items grid, the For Construction and the For Requisition checkboxes of all the items in the selected fabricate part list are updated.
-
To save the changes, on the Home menu, in the Record group, select Save.