Apply supply responsibility to a general MTO line
- Last UpdatedMay 07, 2026
- 1 minute read
A supply responsibility rule defines the default setting for the For Construction and the For Requisition checkboxes of a general Material Take-Off (MTO) item, as defined in the s21018 Supply Responsibility Matrix screen. For example, you can define a rule that all materials used at a specific site is to be purchased and handled entirely by a subcontractor. Based on the supply responsibility rule defined in the Supply Responsibility field, the For Construction and the For Requisition checkboxes of the general MTO item are updated. If no rule applies to a general MTO item, then no updates are made for the item.
-
Navigate to the s22041 General MTO screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the MTO Lines grid, select a row.
-
On the s22041 menu, in the Options group, select Apply Supply Responsibility.
In the MTO Items grid, in the General tab, the For Construction and the For Requisition checkboxes of all the general MTO items related to the selected general MTO line are updated.