Define a supplementary item for a project component
- Last UpdatedMay 07, 2026
- 2 minute read
You can breakdown a project component into supplementary items. To include a project component as one of the supplementary items, see Include a project component as a supplementary item.
Prerequisites
Before you begin, complete the following:
-
Ensure the system related to the project component is set up to allow breakdown into supplementary items through the d0073 ERM System Settings dialog.
-
Ensure no stock transactions exist for the project component.
-
Ensure the project component is not related to a fabricate in the s20017 Fabricate Catalogue screen.
-
Ensure the project component is not related to a picking list.
-
Ensure the project component is not related to a standard material.
-
If the project component is related to a Delivery Request List (DRL), ensure the external status of the DRL is Preliminary.
-
In the s51004 Expediting screen, ensure the Actual Dispatch Date field is not defined for the project component.
-
In the s20010 Project Components screen, ensure the Shelf Life Req checkbox is not selected for the project component.
To define a supplementary item for a project component
-
Navigate to the s20010 Project Components screen.
-
In the Current Project control block, from the Project dropdown, select the required project ID.
-
To refresh the screen, select the F5 key.
-
In the Project Component grid, select a row.
-
Select the Supplementary Items tab and select anywhere in the related grid.
-
On the Home menu, in the Record group, select Create.
In the grid, a blank row is created.
-
Perform the following:
-
In the Qty field, enter the quantity of the supplementary item.
-
From the Unit dropdown, select the unit of measure for the quantity entered in the Qty field.
-
To indicate the supplementary item is the cost carrier of the entire cost for all the supplementary items related to the project component, select the Cost Carrier checkbox.
-
-
On the Home menu, in the Record group, select Save.
The supplementary item is defined for the selected project component.