s22013 Field descriptions

  • Last UpdatedNov 04, 2025
  • 2 minute read

Common fields in the screen

Field

Description

SI

Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates.

Defined By

The ID of a user who created a record.

Defined At

The date and time when a record was created.

Updated By

The ID of a user who updated a record.

Updated At

The date and time when a record was updated.

Current Project control block

Field

Description

Project

The ID of a project related to a construction area.

Description

The description of a project related to a construction area.

Status

Indicates the status of a project. If the project is closed, you cannot update any information for the project.

Template

Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations.

Construction Areas grid

The following table describes the fields in the General tab.

Field

Description

Discipline

The ID and description of a drawing discipline related to a construction area.

Construction Area Code

The unique ID of a construction area.

Description

The description of a construction area.

Status

Indicates the status of a construction area. If the Status checkbox is selected, the construction area is available for use throughout AVEVA Enterprise Resource Management.

Delivery Designations grid

The following table describes the fields in the General tab.

Field

Description

Delivery Designation

The ID of a delivery designation related to a construction area.

Site Id

The ID of a site related to a delivery designation.

Activity

The ID of an activity related to a delivery designation.

Activity start date correction

The allowed time difference between the planned start date of an activity and the actual start date of the activity.

Delivery Date

The delivery date is calculated as the start date of the activity defined in the Activity field, offset by the number of days defined in the Activity start date correction field.