s23002 Material Allocation Package
- Last UpdatedMay 07, 2026
- 1 minute read
Create and maintain a list of material allocation packages. You can group site Material Take-Offs (MTOs) into a material allocation package, based on the related construction area, pipeline, material grades, priority, and so on. You can add site MTOs to a material allocation package manually or through a filter.