Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

Add hull materials to an ABoM

  • Last UpdatedMay 07, 2026
  • 1 minute read

Add predefined hull materials from the catalogue to an Advance Bill of Materials (ABoM).

  1. Navigate to the s21002 Advance Bill of Materials - ABoM screen.

  2. In the Current Project control block, from the Project dropdown, select the ID of the required project.

  3. To refresh the screen, select the F5 key.

  4. On the s21002 menu, in the Add Positions group, from the From Catalogue dropdown, select Hull Material.

    The d0081 Hull Material Multi Item select dialog appears.

  5. To refresh the dialog, select the F5 key.

    The hull materials in the Fully Validated status appear.

  6. In the Hull Material grid, select one or more materials, and then select the Enter key.

    The selected materials appear in the Selected Items grid.

  7. In the Selected Items grid, in the Quantity field, enter the required quantity for each material.

  8. Select Insert.

    The materials appear in the Advance Bill Of Materials grid.

  9. (Optional) Enter the relevant details in other fields as required. For more information on all the fields, see s21002 Field descriptions.

  10. On the Home menu, in the Record group, select Save.

    The hull materials are added to the ABoM.

TitleResults for “How to create a CRG?”Also Available in