Reopen a general MTO line
- Last UpdatedMay 07, 2026
- 1 minute read
Reopen an approved general Material Take-Off (MTO) line. You can make changes after you reopen the general MTO line. For the general MTO line, in the MTO Lines grid, in the General tab, in the MTO Status field, ensure the value is Approved.
-
Navigate to the s22041 General MTO screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the MTO Lines grid, select a row.
-
On the s22041 menu, in the Workflow group, from the Workflow dropdown, select Open.
In the MTO Lines grid, in the General tab, the value in the MTO Status field is updated to Working. Additionally, the value in the Version field increases by one.
-
To save the changes, on the Home menu, in the Record group, select Save.