Relate a cost account to a level
- Last UpdatedMay 07, 2026
- 1 minute read
Before you relate a cost account to a level in a project, ensure the cost account is created in the s10003 Cost Accounts screen.
-
Navigate to the s10005 Set-Up Cost Structure and Accounts screen.
-
In the Current Project control block, from the Project dropdown, select the ID of the required project.
-
To refresh the screen, select the F5 key.
-
In the Levels and Cost Accounts section, expand the project ID, and then select the ID of a level.
-
Select anywhere in the Cost Accounts grid.
-
On the Home menu, in the Record group, select Create.
In the Cost Accounts grid, a row is created.
-
In the Cost Accounts grid, from the Cost Acc dropdown, select the ID of a cost account.
-
On the Home menu, in the Record group, select Save.
The cost account is related to the selected level.
-
To view the cost accounts related to the level, in the Levels and Cost Accounts section, expand the project ID, and then expand the level ID.