Apply supply responsibility to a hull unit material list

Apply supply responsibility to a hull unit material list

  • Last UpdatedMay 07, 2026
  • 1 minute read

A supply responsibility rule defines the default setting for the For Construction and the For Requisition checkboxes of a hull unit material list item, as defined in the s21018 Supply Responsibility Matrix screen. For example, you can define a rule that all materials used at a specific site is to be purchased and handled entirely by a subcontractor. Based on the supply responsibility rule defined in the Supply Responsibility field, the For Construction and the For Requisition checkboxes of the hull unit material list item are updated.

  1. Navigate to the s30000 Hull Unit Material List screen.

  2. To refresh the screen, select the F5 key.

  3. In the Hull Unit Material List Header grid, select a row.

  4. On the s30000 menu, in the Options group, select Apply Supply Responsibility.

    In the Hull Unit Material List Items grid, the For Construction and the For Requisition checkboxes of all the items in the selected hull unit material list are updated.

  5. To save the changes, on the Home menu, in the Record group, select Save.